SCP machine designed by MCC for Tangshan,ChinaPost date: 2015-10-10View:2

SCP machine designed by MCC for Tangshan Jiahua Coking Plant is located in Tangshan(Heibei province) and it went into production in 2009. It marks that the technology of large-scales tamping coke oven in our country is mature. MCC undertook engineering design and constru......

Relocation of 4.2m Plate Mill in Shanghai Pudong Steel,ChinaPost date: 2015-10-10View:4

Relocation of 4.2m Plate Mill in Shanghai Pudong Steel was located in Pudong New District. It was commissioned in February 2009. The annual production is 1,500,000 million tons of iron, 1,825,000 million tons of crude steel and 1.4 million tons of plates . MCC undertook ......

Shanghai Baosteel, ChinaPost date: 2015-10-10View:15

Shanghai Baosteel located in Baoshan District Shanghai ,is China's most competitive iron & steel enterprise with the highest level of modernization Baosteel made its the Fortune Global 500 fot the ninth consecutive time and ranked 197th in 2012.MCC undertook the EPC cont......

30MW Installed Capacity of Guodian Tangyuan Biomass Power Generation Project,ChinaPost date: 2015-08-29View:7

Tangyuan Biomass Power Generation Project of China Guodian Group with installed capacity 30MW,designed by MCC.......

Wuxi Xidong Domestic garbage Incineration Power Plant,ChinaPost date: 2015-08-29View:5

Wuxi Xidong Domestic Garbage Incineration Power Plant,developed by MCC on BOT mode,with design capacity 200t/d.......

The Second Period of shanghai Confluent Sewage Treatment Project- Bailong Port Sewage Treatment Plant,ChinaPost date: 2015-08-29View:6

Shangliai Heliu Sewage Treatment Project Phase II (Bailong Port Sewage Treatment Plant),the largest Treatment Plant in the world with capacity of 1.72 million t/d . MCC undertook construction work of the project.......